top of page
Kiss Me, Kate - EC Glass High School 2016
JD Stallings - Technical Director/Scenic Designer
Kiss Me Kate 2016Dressing Room Hallway Set | Dressing RoomsGroundplan Draft showing double revolve used to switch between hallway and dressing room interiors | Dressing Room WallsMulti-view construction drawing with cut list |
---|---|---|
Dressing Room Interiors | Creative Connors RevolverOn loan from Radford University | Creative Connors RevolverOn loan from UVA |
Dressing room unitUnder construction | Dressing room unitIn transition during tech. Entire unit stored in SL wing during other scenes | Baptista's HouseResearch image |
Baptista's houseFinal scenic unit | Baptista's houseShowing alternate side for Alley scene and interior scaffolding for balcony access. | Padua squareResearch image |
Padua squareIn production | Back alleyResearch image | Back Alley3D Sketch |
Loading dock in alleyRear elevation construction drawing | Loading dock unitDuring tech. | Loading DockIn production |
Too Darned HotSet in Back Alley | Set Call To-Do listEntire company and parents (roughly 40 people) worked from 9-5 one Saturday in shifts under my supervision |
bottom of page